Customization: | Available |
---|---|
Certification: | CE |
Condition: | New |
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Technical Parameter
|
|
Max. Drilling Depth
|
200m
|
Drilling Hole Dia.
|
90-315mm
|
Working Pressure
|
1.7-3.0Mpa
|
Air Consumption
|
17-35m3/min
|
Drill Pipe Length
|
3m
|
Drill Pipe Dia.
|
76mm/89mm
|
Axial Pressure
|
4T
|
Lifting Force
|
14T
|
Lifting Speed
|
2.5m/min
|
Push Speed
|
0.5-5m/min
|
Fast lifting Speed
|
35m/min
|
Max.Rotation Torque
|
4500-6500Nm
|
Rotation Speed
|
50-70r/min
|
Working Hoist Lifting Force
|
1.5T
|
Mud Pump Flow Rate
|
20L/min (optional)
|
High Pressure Hydraulic Legs Stroke
|
1.5m
|
Drilling Efficiency
|
10-35m/h
|
Travel Speed
|
2Km/h
|
Grade ability
|
30°
|
Weight
|
5.4T
|
Dimension
|
3.9x1.7x2.15m
|
Diesel Engine
|
77KW(Yuchai )
|
Application formation
|
loose layer or bedding rock
|
Drilling Method
|
Top Hammer Hydraulic Rotating and feeding,
|
Down the hole hammer or mud pump drilling
|