Automatic Top Hammer Surface Blasting Hole Drill/Drilling Rig
Product Description
1-Technical Parameter
Main Specifications |
T630 |
T635 |
T640 |
Drifter Model |
ZY-103 |
ZY-103 |
ZY-104 |
Hole Range |
42-89 mm |
42-89 mm |
64-115 mm |
Drill Pipe |
T38(T45)X3,660/6,095 mm |
T45(T38)X3,660 mm |
T51(T45)X3,660 mm |
Max. Impact Power |
15 Kw |
15 Kw |
20 Kw |
Diesel Engine |
Cummins 93 kW |
Cummins 119 kW |
Caterpillar 168 kW |
Feed/Pullup Force |
16 kN/ 16 kN |
20 kN/ 20 kN |
20kN /20 kN |
Rod Handling System / Rod Storage |
3+1(Manual)/1 |
4+1(Auto) |
6+1(Auto) |
F.A.D. |
3.4 m3/min |
5.7 m3/min |
8 m3/min |
Max. Pressue |
7 bar |
8.5 bar |
10 bar |
Slope Capability |
25° |
25° |
25° |
Track Frame Oscillatiion |
10° |
3.8° |
11° |
Tramming Speed |
High Speed: 4 km/h
Low Speed: 2 km/h |
High Speed: 3.5 km/h
Low Speed: 1.9 km/h |
High Speed: 3.2 km/h
Low Speed: 1.5 km/h |
Weight |
10,500 kg |
11,000 kg |
16,500 kg |
- The track oscillation system makes the center of gravity of the drill rig more stable to climb the slopes up and down, with stronger track traction. The protection design of the cab and drill rod carousel protect personnel from possible danger;
- The rig can drill multiple rock holes in single positioning action. The flexible drilling arm and off-road ability meet complex rock drilling requirements. For hole diameter≤115 mm, hole depth is less than 15 m, the drilling speed is 50% faster than high pressure integrated DTH drilling rig;
. High Efficiency
Automatic rod handling system, up to 7 meter drill rod/pipe and powerful off-road performance reduce rig preparation time.Large displacement and high pressure screw air compressor is equipped for thorough flushing, to highly increase rock drilling speed and reduce the consumption of drilling tools. The large diameter drill rod / pipe reduces the consumption of compressed air for flushing. Powerful feeding and rotation design solves the jamming problem in complex rock situation also meeting high-speed drilling. Single operator reduces labor costs, and large diameter drilling reduces the number of drill holes required. All these reduce the total numbers of working equipment required.
. Environmental Friendly
The standard two-stage dry type dust collector(opetion water mist system) greatly reduces the pollution to the equipment itself, and also environmental friendly.
. Energy Saving
One diesel engine drives both the screw air compressor and the hydraulic system, and the power output is a stagger peak design. Compared to separated drill rig, the total power output of the diesel engine is reduced by about 35%, and the maintenance cost is reduced by 50%. Lower energy consumption, faster rock drilling speed, shorter preparation time and the less hole numbers reduce the unit energy consumption sharply.
. Safety
The track oscilation system makes the center of gravity of the drill rig more stable to climb the slopes up and down,with stronger track traction. The powerful performance reduces the number of equipment and personnel required for the mine. The protection design of the cab and drill rod/pipe carousel protect personnel from possible danger.
Full view cab meeting protection requirement, all weather air conditioning cab with user friendly design, spacious and
comfortable, noise and shock proof.
Clear marks on both ends of each oil and air hose, and electric wire and cable for fast and convenient troubleshooting.
Related Products
Packing and Transport
Packing: Seaworthy Packing
Delivery: about 30 days after your down payment.
Company Profile
Glorytek Industry (Beijing)Co.,Ltd., located in Beijing, China, is an integrated corporation specialized in manufacturing and exporting top quality drilling equipment and drilling parts for decades. We are supported and assisted by a highly experienced team of designers and engineers that enable us to complete all the assigned projects successfully as per the specified requirement from our clients.
Our products are widely used in the scope of mining, water well drilling and exploration, anchor grouting project, side slope protection engineering, oil and gas engineering,underwater rock drilling & blasting operations of seaport channel, hydropower project, national defense projects ect.
Exhibition
Certifications
Customer Photos
After-sale Warranty
(1) Within the period of the first year after delivery, the main parts of Drilling Rig are guaranteed to be supplied free of charge once the problem caused by the quality issue.
(2) Service at working site: If need, our technical engineer can be dispatched to the working site for technical service, but the expense of ticket, accommodation, diet, service charge shall be on buyer's account.
(3)Timely after-sale assistance shall be provided all the time.
FAQ
Q: Are you original manufacturer or trading company?
A: We are an integrated corporation specialized in manufacturing and exporting.
Q: Can you supply related drilling tools?
A: Yes, we can supply full set of drilling tools, such as drill pipe, tricone bit, PDC bit, drag bit, DTH hammer and bit. Moreover, we have drilling equipments like mud pump, air compressor, etc. as well.
Q: Which payment terms can you accept?
A: Normally we prefer 30% advance payment after purchase order by T/T, 70% remaining payment before shipping by T/T.
Q: How is your delivery time?
A: This will depend on your purchasing quantity. Normally we can deliver within 30days.
Q: How can you ensure the quality?
A: We have our professional QC and all the products will be strict inspection and testing for every order before shipping out.
Contact Us
Jane Cheng
Sales Representative
Glorytek Industry ( Beijing ) Co., Ltd.
Address:No.B-2507, DongWeiCheng, GuanZhuang,Chao Yang District, Beijing, China.