| Customization: | Available |
|---|---|
| Certification: | CE |
| Condition: | New |
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Technical Specification of GLIII truck deep water well drilling machines



| Drilling Parameter | |
| Hole diameter : | 120--1500(mm) |
| Hole depth : | 400(m) |
| Run Of Rod : | 3,4(m) |
| Drill rod diameter : | φ73 φ89 φ95 φ133(mm) |
| Drilling Technology : | Normal and Reverse Circulation for both Mud and Air |
| Down-The-Hole hammers: | Middle-High-Pressure Air |
| Performance parameter | |
| Drill Head Inside Diameter : | φ80 φ120 |
| Drill Head lifting Force(kN) : | 130 |
| Drill Head Spin Speed: | A(Forward:20-33-73,Reverse:13-23-47r/min) |
| B(Forward:41-66-146,Reverse:26-43-94r/min) | |
| B(Forward:36-58-127,Reverse:23-37-80r/min) | |
| Shape Parameters | |
| Dimensions : | (L-W-H) Working conditions 9600×2950×7900(mm) |
| Transport status: | (L-W-H) 10200×2470×3300(mm) |
| Supporting Form : | Hydraulic Unit |
| Mast Up-Down : | Hydraulic Unit |
| Rig mass : | 12500(Kg) |
| Chassis : | Dongfeng EQ 1141/ Jiefang CA 1127 (four-wheel drive) |
| Power Unit : | Diesel Engine |
| Power : | 84(kW) |
| Pump : | BW600/30 Mud Pump |
| Flow(m³/h) : | 720 513 335 |
| Pressure(MP): | 3 4 5 |
| Main Hoist Lifting Force : | 25(kN) |
| Auxiliary Hoist Lifting Force : | 8(kN) |
| Notes: Drill head spin speed can be selected, A is normal | |