Crawler Mounted Hydraulic Core Drilling Rig Spt Borehole Drilling Rig Machine Price

Product Details
Customization: Available
After-sales Service: Video Support
Warranty: Video Support
Diamond Member Since 2012

Suppliers with verified business licenses

Audited Supplier

Audited by an independent third-party inspection agency

Plant Area
>2000 square meters
Management System Certification
ISO 9001, ISO 14001
  • Crawler Mounted Hydraulic Core Drilling Rig Spt Borehole Drilling Rig Machine Price
  • Crawler Mounted Hydraulic Core Drilling Rig Spt Borehole Drilling Rig Machine Price
  • Crawler Mounted Hydraulic Core Drilling Rig Spt Borehole Drilling Rig Machine Price
  • Crawler Mounted Hydraulic Core Drilling Rig Spt Borehole Drilling Rig Machine Price
  • Crawler Mounted Hydraulic Core Drilling Rig Spt Borehole Drilling Rig Machine Price
  • Crawler Mounted Hydraulic Core Drilling Rig Spt Borehole Drilling Rig Machine Price
Find Similar Products

Basic Info.

Model NO.
GDL-350
Condition
New
Motor
No
Drill Hole Diameter
75-220mm
Drill Hole Depth
>200m
Bit Type
Diamond Bit
Drilling Way
Compound
Type
Crawler
Keyword
Drilling Rig
Max. Drill Depth
200m
Drill Pipe Dia.
50/60/ 76/ 89mm Nq/ Hq /Pq
Drill Pipe Length
3000mm
Mud Pump(Optional)
Bw160/ Bw200/ Bw250
Drill Rod Diameter
102,108,127mm
Weight with Steel Crawler
5800kg
Whole Dimension
3480*1600*7300mm
Transport Package
Sea Worthy Packing.
Specification
300m
Trademark
GLORYTEK
Origin
Beijing, China
Production Capacity
20 Sets/ Month

Product Description

GDL-350 TOP DRIVE MULTIFUNCTIONAL DRILL RIG

Product Description

ABOUT GDL-350 DRILL RIG:
The drilling rig is a water well drilling equipment that integrates water drilling and air drilling functions. The drilling rig adopts a vehicle-mounted 525 gearbox, which is sensitive and convenient to switch gears. The transmission efficiency is doubled compared with hydraulic transmission, and the power consumption is reduced by 35%., which is energy efficienctly. It solves the difficult problems of air DTH hammer drilling in soil layers and low construction efficiency of rotary drilling rigs for hard rock layers, gravel and pebble layers.
Crawler Mounted Hydraulic Core Drilling Rig Spt Borehole Drilling Rig Machine PriceCrawler Mounted Hydraulic Core Drilling Rig Spt Borehole Drilling Rig Machine PriceCrawler Mounted Hydraulic Core Drilling Rig Spt Borehole Drilling Rig Machine PriceCrawler Mounted Hydraulic Core Drilling Rig Spt Borehole Drilling Rig Machine PriceCrawler Mounted Hydraulic Core Drilling Rig Spt Borehole Drilling Rig Machine PriceCrawler Mounted Hydraulic Core Drilling Rig Spt Borehole Drilling Rig Machine Price

Main Application

1: Core drilling NQ/HQ/PQ
2: Air drilling + DTH hammer
3: Mud drilling with mud pump
Drilling capacity
Drilling depth for water well
300m(152mm~203mm)
Wireline coring NQ size
450~500m
Borehole (Drill bit) dia.
Ø75~Ø350mm
Drilling angle
90°
Drive head
Lifting capacity
120KN
Thrusting capacity
85KN
Rotary speed RPM
Forward:27,51,93,129,156/ 193,247,437,737,901 r/min
Reverse:48/219 r/min
Max. Torque
10500N.m
Power Unit
Engine Model
YN27GBZ
Rated power/speed
58kW/ 2400r/min
Mechanical winch capacity
4.5 Ton
Drill pipe
Drill pipe dia.
Ø50/ Ø60 / Ø76/ Ø89mm NQ/ HQ /PQ
Drill pipe
Drill pipe length
3000mm
Mud pump
BW160/ BW200/ BW250
Crawler chassis
Walking speed
0~2 km/h
Climbing angle
Max. 25°~30°
Dimension
Transport
5400*1600*2600mm
Working
3480*1600*7300mm
Weight with steel crawler
5800kg

Technical Parameter

Main features:

1. The drill speed can reach 27-901r/min, and the maximum output torque is 10500N.m.

2. The drilling rig adopts a long-stroke double-speed mechanism, a mechanical power head, and a power head stroke of 3500mm, which is used to improve drilling efficiency and reduce the occurrence of drill blocking and burning accidents.

3. The drilling rig adopts double oil pumps for oil supply. A single pump is used when drilling, and two pumps are used for confluence when lifting and lowering the drill. The power loss is small and the auxiliary time is short.

4. The crawler chassis is adopted, and the outrigger cylinder stroke is 1.5m, which can be loaded automatically, which is convenient for relocation and transportation.

5. The drilling rig reserves some functional interfaces in the mechanical and hydraulic systems, which can be expanded according to the technological requirements of different users.




Related Products

Crawler Mounted Hydraulic Core Drilling Rig Spt Borehole Drilling Rig Machine Price


Company Profile

Crawler Mounted Hydraulic Core Drilling Rig Spt Borehole Drilling Rig Machine Price

Glorytek Industry (Beijing) Co., Ltd. is an integrated corporation specialized in manufacturing and exporting top quality drilling equipment and drilling parts for more than 20 years. We are supported and assisted by highly experienced R&D team and enginners that enable us to complete all the assigned projects successfully as per clients' requirements.

Our factory covers an area of 250,000 square meters, construction area is about 150,000 square meters, having machining machinery, CNC processing center, friction welding machine, testing equipments etc. over 200 sets and more than 600 employees.

Our products have been exported more than 60 countries, including Australia, Russia, Soutn Africa, Zimbabwe, Malaysia, Indonesia, South Korea, France, Sweden, USA, Canada, Haiti etc.


Crawler Mounted Hydraulic Core Drilling Rig Spt Borehole Drilling Rig Machine Price
Crawler Mounted Hydraulic Core Drilling Rig Spt Borehole Drilling Rig Machine Price

Crawler Mounted Hydraulic Core Drilling Rig Spt Borehole Drilling Rig Machine Price
 

FAQ

Q: How can we choose a suitable water well drill rig?
A: We normally recommend a suitable model according to drilling depth, drilling hole dia. and layer condition on site.
 

Q: Are you a factory or a trading company ?
A: We are an integrated corporation specialized in manufacturing and exporting.


Q: What is your payment terms?
A: We can accept T/T,L/C.

Q:.What is your MOQ? How long is the delivery time?
A: Our MOQ is 1 sets. Normally for drill rig, the delivery time is about 25-30 days after receiving payment, the drilling tools would be about 15 days.

Q:. How long is the warranty?
A: The guarantee period for mainframe is one year (excluding the quick wear parts).

Q: Can we print my Logo on the products?
A: Yes, we can. We support OEM .


 

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now
Contact Supplier