Customization: | Available |
---|---|
Certification: | CE |
Condition: | New |
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
GL-III Truck Mounted Drilling Rig
Main Application
Drilling wells for urban and rural life
Drilling wells for agricultural irrigation and industries
Drilling for geotechnical survey
Drilling construction engineering holes
Drilling geothermal pump wells
Glorytek Industry (Beijing)Co.,Ltd., located inBeijing,China, is an integrated corporation specialized in manufacturing and exporting top quality drilling equipment and drilling parts for decades. We are supported and assisted by a highly experienced team of designers and engineers that enable us to complete all the assigned projects successfully as per the specified requirement from our clients.
Our products are widely used in the scope of mining, water well drilling and exploration, anchor grouting project, side slope protection engineering, oil and gas engineering,underwater rock drilling & blasting operations of seaport channel, hydropower project, national defense projects ect.
Main Specification
Drilling Parameter |
|
Hole diameter: |
120--1500(mm) |
Hole depth: |
350(m) |
Run Of Rod: |
3,4(m) |
Drill rod diameter: |
φ73 φ89 φ95 φ133(mm) |
Drilling Technology: |
Normaland Reverse Circulation for both Mud and Air |
Down-The-Hole hammers: |
Middle-High-Pressure Air |
Performance parameter |
|
Drill Head Inside Diameter: |
φ80 φ120 |
Drill Head lifting Force(kN): |
130 |
Drill Head Spin Speed: |
A(Forward:20-33-73,Reverse:13-23-47r/min) |
B(Forward:41-66-146,Reverse:26-43-94r/min) |
|
B(Forward:36-58-127,Reverse:23-37-80r/min) |
|
Shape Parameters |
|
Dimensions: |
(L-W-H) Working conditions 9600×2950×7900(mm) |
Transport status: |
(L-W-H) 10200×2470×3300(mm) |
Supporting Form: |
Hydraulic Unit |
Mast Up-Down: |
Hydraulic Unit |
Rig mass: |
12500(Kg) |
Chassis: |
Dongfeng EQ 1141/JiefangCA1127 (four-wheel drive) |
Power Unit: |
Diesel Engine |
Power: |
84(kW) |
Pump: |
BW600/30 Mud Pump |
Flow(m³/h): |
720 513 335 |
Pressure(MP): |
3 4 5 |
Main Hoist Lifting Force: |
25(kN) |
Auxiliary Hoist Lifting Force: |
8(kN) |
Notes: Drill head spin speed can be selected, A is normal |